assalammualaikum..
here is my updated literature review :)
Nurul Amira FYP
Friday, November 18, 2011
Sunday, November 13, 2011
Thursday, November 3, 2011
Week 8: Objectives
Assalammualaikum..
Objectives:
· to explain how GUIDe process model are used
· to derive user interface requirement using GUIDe process model
· to design the user interface of SPASA system
Working on my literature review right now :)
Sunday, October 23, 2011
Week 7: Research Background and Problem Statement
Assalammualaikum..
Problem Statement
Problem Statement
- Rational Unified Process (RUP) classifies the User-Interface Designer role as a role with no responsibility in the requirement stage of the project. This lead to missing essential features, usability problems that are caused by inefficient or confusing interaction with the system and that lead to waste of time, errors and need for extra training.
Research Background
“The user interface is part of the computer
and its software that people can see, hear, touch, talk to, or otherwise
understand or direct, which has two components: input and output” (Wilbert O.
Galitz, 2007)
. User interface will be act as a medium interaction between user and the
interface of the SPASA system. Providing consistent user interface not only
make the system usable but reduces training, support and testing cost. However,
during the requirement stage, the user interface designer role is passive. This lead to missing
essential features, usability problems that are caused by inefficient or
confusing interaction with the system and that lead to waste of time, errors
and need for extra training.
In GUIDe process model
(Goals-User Interface Design-Implementation), the user interface is designed at
the beginning of the project as a specification for the implementation and
database design. During this phase, required functionality and interaction are
derived from goal-based use case, which are discovered through field studies.
Figure
1.0: Main phases of GUIDe process model
Lembaga
Urus Air Selangor (LUAS) is a government agency that responsible for managing
water resources and river basin in Selangor. In LUAS, the Water Resources
Licency System (SPASA) is currently being enhanced to from an Oracle form to a
web-based application which enable the client to view their information by
access the system anytime they wanted to.
Monday, October 17, 2011
Week 6: Project Title
Assalammualaikum..
Project Title : Deriving User Interface Requirement for SPASA system using
GUIDe Process Model
Subscribe to:
Posts (Atom)